Transparency · How It Works

See exactly howSilverpines builds.

No scripts. No stock footage. Mitch walks through every component of a real build — on camera, on site, in his own words. Tap any part of the deck to watch.

6 Real Job Site Videos
Every Component Explained
Zero Guesswork

Interactive Build Guide

Pick a part. Mitch explains it.

Full Deck Walkthrough

Finished Build

Mitch walks through the completed project — composite surface, railing, stairs, everything done. This is exactly what you get when the build is wrapped: no punchlist, no callbacks, permit passed.

The Standard

What goes into every Silverpines build

Not upsells. Not options. This is the baseline — every project, every time.

Decking

TimberTech Composite

25-yr fade warranty

Railing

Westbury Aluminum

Powder-coated, no rust

Fasteners

Hidden System

Zero exposed screw heads

Framing

PT Lumber + Joist Hangers

Code-compliant throughout

Permits

Pulled & Inspected

Every project, no exceptions

Timeline

3–7 Build Days

Most decks done in a week

Why We Do This

An educated homeowner is a better client.

Most contractors keep the build process vague on purpose. Vague means upsells. Vague means you can't push back on pricing. Vague means you don't know if the work was done right until something fails two winters later.

We'd rather you understand every component before we ever talk money. When you know what you're getting, the quote conversation is faster, cleaner, and nobody gets surprised.

No hidden scope

Everything we build is in the written quote before we start. What you sign is what you pay.

No subcontractors

Mitch handles every build personally. When you hire Silverpines, you get Mitch.

Inspection included

We pull permits and pass inspection on every project. That protects you if you sell.

Ready to talk about your project?

Free on-site estimate. Written quote. No pressure. You know exactly what you're getting before anything starts.

Call (612) 483-1880